The Otsuka site consisted of 2.6 acres of open farm land and an existing warehouse/shipping building constructed in the 1960s. The project would test several design possibilities before settling and developing a design to place its District printing in the...MunicipalDon2007-08-25T12:26:15-08:00Glenview Elementary Modernization
http://www.krotee.com/archives/000059.html
DKP performed architectural services for a series of state-approved and processed modernizations for the Placenta-Yorba Linda Unified School District. At each school site an advisory panel was assembled and interviewed to determine the site's needs. Plans were then prepared within...MunicipalDon2005-12-30T11:51:14-08:00Glenknoll Elementary Modernization
http://www.krotee.com/archives/000058.html
DKP performed architectural services for a series of state-approved and processed modernizations for the Placenta-Yorba Linda Unified School District. At each school site an advisory panel was assembled and interviewed to determine the site's needs. Plans were then prepared within...MunicipalDon2005-12-30T11:45:00-08:00Brookhaven Elementary Modernization
http://www.krotee.com/archives/000057.html
DKP performed architectural services for a series of state-approved and processed modernizations for the Placenta-Yorba Linda Unified School District. At each school site an advisory panel was assembled and interviewed to determine the site's needs. Plans were then prepared within...MunicipalDon2005-12-30T11:38:06-08:00Linda Vista Elementary Modernization
http://www.krotee.com/archives/000056.html
DKP performed architectural services for a series of state-approved and processed modernizations for the Placenta-Yorba Linda Unified School District. At each school site an advisory panel was assembled and interviewed to determine the site's needs. Plans were then prepared within...MunicipalDon2005-12-30T11:31:22-08:00George Key Ranch House Museum
http://www.krotee.com/archives/000055.html
The County of Orange hired DKP as a historic restoration specialist when they were seeking to repair and restore the original chimneys in the circa 1898 museum. DKP was hired by the County of Orange to repair and restore the...HistoricDon2005-12-30T11:17:45-08:00Chapman Univ. - Smith & Reeves Halls
http://www.krotee.com/archives/000054.html
DKP accomplished a simultaneous exterior restoration and repainting to two of Chapman University’s oldest buildings, Smith and Reeves Halls. The two circa-1954 structures were in need of careful restoration, as the existing ornamentation was deteriorated to the point of crumbling....MunicipalDon2005-12-30T10:39:37-08:00New Warehouse Site
http://www.krotee.com/archives/000053.html
A school district was seeking a new site for their warehouse and distribution center. The district acquired a 8.75 acre parcel and requested that DKP perform the conceptual site planning for four potential users: Relocated warehouse and office space only....PlanningDon2005-12-30T10:18:06-08:00Taqueria Tapatia, 1st Street
http://www.krotee.com/archives/000052.html
In 1999, the owner of an established and successful Mexican restaurant sought to add a second location. DKP successfully designed his new 1,800 square foot restaurant within the confines on a small downtown site. The owner was pleased and is...CommericalDon2005-12-29T12:28:00-08:00Santa Ana YMCA
http://www.krotee.com/archives/000051.html
DKP is currently working with a client who seeks to restore the historic four-level Santa Ana YMCA building as a new community shared health, conference, and counseling center. DKP will completely restore the interior and exterior to its original 1927...HistoricDon2005-12-29T11:39:18-08:00
http://www.krotee.com/archives/000050.html
This existing weekend home was built by our client in the mid 1970s. After many years of service, the owner wished to update and reconfigure their weekend "get-away" home to meet their current family needs. The exterior and interior were...ResidentialDon2005-06-29T15:27:05-08:00Big Bear Cabin (Interior)
http://www.krotee.com/archives/000036.html
The project was completed from an original design by David S. Buchanan. The interior was designed by Claudia McBain and Donald Krotee. The extreme downhill lot had several topographic and drainage challenges. The site also took advantage of panoramic lake...InteriorsDon2004-06-08T10:43:17-08:00Masonic Temple
http://www.krotee.com/archives/000035.html
The project required that a feasibility analysis be completed to determine the costs and the feasibility of housing various assembly and exhibit spaces. The project is an excellent example of a large community facility analysis and retrofit. Community meetings were...HistoricDon2004-06-07T16:38:07-08:00Huntington Harbor Estate
http://www.krotee.com/archives/000034.html
This custom home was completely gutted and remodeled. The new plans called for four bedrooms with a separate guest quarters. The land required a 6% waffle slab because of the high water table. The style of the house was completely...ResidentialDon2004-06-04T16:19:23-08:00Huntington Harbour Auto Wash & Car Care Facility
http://www.krotee.com/archives/000033.html
The owner had purchased a service station with the intention to re-open it as a full service auto wash. The project was approved only with a CUP through the City of Huntington Beach. The surrounding 2 sides of the buildings...CommericalDon2004-06-04T15:48:40-08:00